Plum Hollow – a sort of update

Plum Hollow, minor progress

Picture of the kits

Test build on paper of the trial hut and 2 of the 5 sheets for the next trial project.

For a variety of reasons the Plum Hollow layout project has had almost nothing done on it for some time. That was not a case of out of sight out of mind, simply a case of other workload intervening.  The scenic side is the next step, hence today’s test kit build. The aim was to see if a  printed paper/card kit scaled down from the originally intended HO (1:87) scale to US N scale (1:160) would either (be 1) too fiddly to construct or (2) not look good enough after completion. The test suggests both answers are negative, the outcome therefore is positive and therefore a run printed onto card-stock is worth trying. This simple build with unreinforced paper prints suggests constructing the kits will be manageable with card-stock backing.

As progress since the last update the polystyrene blocks have been bought as has the 4mm scale Dapol signal gantry kit I intend to use as  lattice girder railway over river bridge.

There is a possibility that the existing base boxes may get re-purposed into another project and replaced for this one.  If that happens an update will be posted. If it does it will be for a quick build project for the Warley (and onwards) shows; with this one it will be time that determines the outcome.

As a final point the scaling experiments for this exercise indicate that the ratio of printing the pdf plans at 54.4% is correct.  Although they are not currently accessible to check when I’d made the buildings for Reindeer Landing (N Gauge side) they always looked too small; it is possible they had been printed at 25% (The area reduction) rather than 54.4% which gives the necessary shrinkage in each linear dimension.

SLS Workload

This is one of the reasons for the delays mentioned above.Situations Vacant adverts are included in the current Journal going out to members in the hope of filling some of the vacancies. Once that gets delivered to members the adverts for those vacancies where open recruitment will be possible will also be circulated to non-members. In the meantime several officers are doubling up, even tripling up, on roles to keep us going. The trouble with being a volunteer – you tend to volunteer whenever crisis looms.

 